The Energy Division pods are now officially up and running with both electricity and natural gas fully installed and flowing through the system. This milestone significantly enhances the training environment for SEED students, providing a more realistic, hands-on learning experience as they prepare for fieldwork in the energy sector.
The installation work was completed by former Energy Division Installer Danny Valencia and his DNA Crew, who led the effort to run a gas line from the front of the property through the warehouse and into the pods. The project included trenching, fabrication, and full system installation to ensure safe and functional delivery of utilities throughout the training space.
With these upgrades complete, the pods are now fully “live,” marking an important step forward in expanding practical training opportunities for students.